Located at Kilometer 3rd on Vietnam’s longest cross-sea bridge connecting Lach Chiec Port and Dinh Vu – Cat Hai Economic Zone, VINFAST’s mega project – is the most ambitious industrial project in Vietnam’s history: a factory complex that, within two years, will make the first Vietnamese “national car”. ATAD is proud of being the steel structure contractor of designing, manufacturing, and erection of this project.
We have installed approximately 22,000 tons of steel structure and 55,000 m2 of steel panel in two months. With long experience in realizing large and complicated structures, ATAD has applied in Vinfast project an optimized steel structure solution that helps to create wider open space and larger clear span. In addition, such structure allows a better optimization of M&E internal arrangement and represents a very efficient investment for the client. To meet the schedule, the erection team have worked 2 shifts per day under the sun’s heat of North Vietnam summer with the temperature up to 400C.
At present, ATAD erection team has reached major milestones and meets all the requirements from the investor and supervisors.