In 2019, Fraser and Neave consumer groups (F&N) deployed the construction of an Emerald Brewery in Hlegu, Yangon, marking a return to the Myanmar market. This is a modern brewery specializing in distributing Chang Lager beer brand – one of the most famous types of beer in Thailand.
Following the successful cooperation in Phase 1 with a total area of more than 22,000 m2, in November 2020, ATAD continues to be selected as the contractor of steel structure for phase 2 of the project. With the capacity and professional construction plan, the ATAD engineers team has applied the method of module erection with an output of 45 rafters within 12 days, doubling the output and progress set by the Investor. This project demonstrates ATAD’s ability and experience in flexibly offering appropriate erection measures with quality, progress, and safety requirements.