ATAD STEEL STRUCTURE CORPORATION
logo 20 years blue

Erection

Erection of pre-engineered buildings and steel structure is the last step in our building process that all the components from the previous steps come together.

General Rules

  • Build column combing with purlins (if any), brace column together. Then, continue building rafters after adjusting column.
  • Install the inside truss frames, and then proceed to erect the outside ones (according to the movement of truck crane – see the enclosed construction drawing)
  • Begin erecting from the braced bay.
  • Settle two construction frames at the braced position before placing new frame. This process is translated for the next frame.
  • Have to have temporary brace during the erection process. Use purlins with the bracing cable to locate, and link all the rafter frames.
  • Erect steel panel after adjusting rafter frame and straight purlin, clean up, and paint all scratches on the rafter and purlin.
  • Use chalks or stretch attached wires to locate or mark axis positions in order to balance the steel panel when to complete the covering.
  • Set foot on the bottom waves when walking on the roof. Steel panel may be crashed if stepping on the high waves, which can cause deformation or leaking.
  • Do not walk on bright panels.

Erection Steps

Step 1: Prepare before erection

Check the erection equipment, and materials, including: quantity, safety, quality…

Step 2: Erect column

Prepare Erection Prepare Erection 1 Prepare Erection 2

Step 3: Erect rafter

Erection rafter Erection rafter 1 Erection rafter 2

Step 4: Erect purlin, and brace

Step 5: Calibrate the first frame

Erection purlin, bracing Erection purlin, bracing 1 Calibration the first frame 2

Step 6: Erect next frame

Step 7: Complete installation for the rest frame

Step 8:  Erect roof monitor

Erection next frame Complete others frame Erection monitor

Step 9: Check completion before covering

Step 10: Erect covering and finish

Testing for completion before covering Erection covering and finisher 1 Erection wall cladding 1
Email to ATAD Fill to the form

QR Code

Share your page with anyone by asking them to scan this QR code

Copy & share