Phu Bai International Airport – T2 Terminal project is invested by Airports Corporation of Vietnam – JSC. The project has a total investment of 2,250 billion VND. The station is designed with 3 floors including 1st floor, mezzanine and 2nd floor.
The construction area is about 10,118 m2, total construction floor area is about 22,381 m2. The completion of passenger T2 terminal will increase the capacity of Phu Bai airport to 5 million passengers/year.
In this project, ATAD was trusted to be selected as a contractor of detailed design, fabrication, and erection of steel structure items with a total volume of nearly 2700 ton.